Maintenance Log

10 entries · last 90 days
DateAssetActionPerformed byOutcomeHrsWO
Apr 21, 2026
preventive
Doble Calisto R9 monthly calibration verification
Gas-in-air calibration passed. Headspace pressure 2.3 psi steady.
Dana Fordpreventive1.5WO-2026-001
Apr 14, 2026
corrective
Bushing tap reseating after PF drift alert
Opened bushing test tap on LV-B, reseated with Noalox — PF trended back to 0.37%. Continue watching.
Alex Riveracorrective4WO-2026-002
Apr 4, 2026
preventive
Quarterly battery impedance sweep
All 60 cells within 7% of average. Cell 37 trending high — schedule replacement Q3.
T. Sabatpreventive3WO-2026-003
Mar 27, 2026
preventive
Annual breaker timing + contact resistance
Close time 42 ms, trip 18 ms. Contact resistance A/B/C = 22/24/23 µΩ.
Dana Fordpreventive5WO-2026-004
Mar 12, 2026
inspection
IGBT module thermal scan
Bank 2 showed 8 °C hot-spot relative to peers — fan bearing suspected.
Casey Parkinspection2WO-2026-005
Feb 23, 2026
preventive
Oil sample — laboratory DGA (Myrkos 2 portable)
Correlates with online Calisto R9 within 5%. Moisture 13 ppm.
Alex Riverapreventive2WO-2026-006
Jan 26, 2026
preventive
HVAC filter replacement + refrigerant top-up
Contractor · DesertHVACpreventive1WO-2026-007
Dec 27, 2025
commissioning
Calisto T1 commissioning (bushing + PD + iO)
All 6 bushings wired, PD baseline captured, iO inputs validated. Install 5.5 hrs.
Dana Ford + Doble commissioningcommissioning5.5WO-2025-008
Nov 27, 2025
commissioning
IDP/UDP ingest validation — curated stream list v2
Shaved firehose 48K points → 62 critical streams. Peer benchmark baseline established.
T. Sabatcommissioning8WO-2025-009
Oct 28, 2025
preventive
Semi-annual SF6 density check + control power validation
Dana Fordpreventive2.5WO-2025-010